Civic arena matchup
Grimsby vs Ottawa
City Score 2025 head-to-head across seven pillars. National ranks of 343 places. Challenger A is teal, challenger B is navy — missing readings stay blank.
Grimsby vs Ottawa — City Score 2025
Grimsby: 65% (#20 of 343). Ottawa: 71% (#5 of 343). Pillar wins: Grimsby 3, Ottawa 3.
| Pillar | Grimsby | Ottawa |
|---|---|---|
| City Score | 65% (#20 of 6) | 71% (#5 of 7) |
| Drinking water | 169 mg/L (#183 of 343) | 112 mg/L (#285 of 343) |
| Building permits | $645M (#100 of 343) | $459M (#179 of 343) |
| Internet | 1000 Mbps (seed tier) (#36 of 343) | 635 Mbps (seed tier) (#146 of 343) |
| Radon | 85 Bq/m³ (#170 of 238) | 112 Bq/m³ (#113 of 238) |
| Hazards | No data | No data |
| Property tax | No data | 7.36 mills (#54 of 57) |
Matchup verdict · Dead heat
Dead heat at 3–3. Neither city runs away on the pillar board — call it a draw until the next data refresh.
Pillar duel boards
Metric-by-metric face-off
One row per pillar — Grimsby left, Ottawa right, delta in the middle. Bars mirror toward centre.
City Score
Drinking water
Lower hardness rank wins on standing
Building permits
Internet
ISED National Broadband Data — advertised availability tier
Radon
Lower indoor radon wins
Hazards
Lower seismic PGA wins
Property tax
Lower mill rate wins
Final tally · category wins
Grimsby
3
Categories won
Ottawa
3
Categories won
Pick another matchup · City Score table · Grimsby city page · Ottawa city page