Saint-François River
City UTE staff also maintain sector reservoirs/boosters (industrial park, Grantham, Saint-Nicéphore) on the greater Drummondville network.
Drummondville rebuilt its century-old river plant in place—keeping the Saint-François intake while replacing the 1925-era process train.
Usine de traitement de l’eau de Drummondville (nouvelle UTE)
Replacement plant (in service 2025) near the Saint-François River intake used by the historic 1920s works. Design capacity near 75,000 m³/day with expansion headroom toward 90,000 m³/day. Serves Drummondville plus Saint-Majorique, Saint-Germain-de-Grantham, and Saint-Cyrille-de-Wendover.
Hardness 173 mg/L (Hard)
Grade B (Good)
pH 7.6 · lead 0.5 μg/L
ECCC / municipal open data (seed)